Steel Buildings West Midlands
Overall sizes the Pre galvanised Omega Steel Building in West Midlands for a building kit will produce:
Specification file |
Wind speed |
Site Altitude |
Distance from coast |
Building location |
Height to eaves |
Gable width |
Length |
Roof pitch |
Building style |
Column centres |
Number of bays |
Cladding type |
Roller doors |
Steel Security door, powder coated |
Rain water system |
Building kit |
Lead Time |
6m x 12m x 3m to eaves Town Location |
Download |
20 m/s |
140 m |
109 km |
town |
3.000 m |
6.000 m |
12.000 m |
12 degrees |
Ridge |
3.847 m |
3 |
Single Skin Polyester 0.7mm Roof panels 0.5mm Wall Panels |
1 x Industrial Roller Door 3m wide by 2.5m high |
1 |
none |
Building Kit price based on the above: |
£ 8,185.04 + VAT Ex works |
3 – 4 Working weeks from receipt of final approval and account clearance |
8m x 15m x 3m to eaves Town Location |
Download |
20 m/s |
140 m |
109 km |
town |
3.000 m |
8.000 m |
15.000 m |
12 degrees |
Ridge |
3.631 m |
4 |
Single Skin Polyester 0.7mm Roof panels 0.5mm Wall Panels |
1 x Industrial Roller Door 3m wide by 2.5m high |
1 |
none |
Building Kit price based on the above: |
£ 10,355.82 + VAT Ex works |
3 – 4 Working weeks from receipt of final approval and account clearance |
6m x 12m x 3m to eaves Countryside Location |
Download |
20 m/s |
140 m |
109 km |
country |
3.000 m |
6.000 m |
12.000 m |
12 degrees |
Ridge |
3.841 m |
3 |
Single Skin Polyester 0.7mm Roof panels 0.5mm Wall Panels |
1 x Industrial Roller Door 3m wide by 2.5m high |
1 |
none |
Building Kit price based on the above: |
£ 8,185.04 + VAT Ex works |
3 – 4 Working weeks from receipt of final approval and account clearance |
8m x 15m x 3m to eaves Countryside Location |
Download |
20 m/s |
140 m |
109 km |
country |
3.000 m |
8.000 m |
15.000 m |
12 degrees |
Ridge |
3.631 m |
4 |
Single Skin Polyester 0.7mm Roof panels 0.5mm Wall Panels |
1 x Industrial Roller Door 3m wide by 2.5m high |
1 |
none |
Building Kit price based on the above: |
£ 10,355.82 + VAT Ex works |
3 – 4 Working weeks from receipt of final approval and account clearance |
If this is not what you are looking for click here